Cable tray entry was sealed into electrical rooms of Minera Barrick at Lagunas Norte mine. The customer required to seal their rooms to prevent the dust from the crushers entering their rooms. Roxtec’s multidiameter modular system was used to prevent the entry of dust and water through the incoming of cables in walls and ceilings of rooms.

PROJECT INFORMATION
Client: Minera Barrick Misquichilca
Propietario
Type:
Location: Mina Lagunas Norte, Alto Chicama
Date: 1/08/12

ADDRESS

OFFICE Calle Horacio Cachay Díaz 189. Urb. Santa Catalina - La Victoria

PHO. (+51) 1 719-9740 | (+51) 9980-05732

EMAIL ventas@synixtor.com