Cable sealing transits was carried out in the control room, battery room, piping and duct banks with Roxtec multidiametral system, with which we achieved the hemetization against water and dust and fire protection 2 hrs.

PROJECT INFORMATION
Client: GYM SA
Propietario
Type: Oil & Gas
Location: Lurín
Date: 1/01/04

ADDRESS

OFFICE Calle Horacio Cachay Díaz 189. Urb. Santa Catalina - La Victoria

PHO. (+51) 1 719-9740 | (+51) 9980-05732

EMAIL ventas@synixtor.com

SÍGUENOS

© Copyright 2016 | Synixtor. All Rights Reserved Developed by Lima Dot