The aim was to seal the engine room of the hydroelectric plant. For this purpose, Roxtec multiple diameter seals were used to seal pipes and rectangular frames for sealing cable trays. It managed to prevent the entry of dust in cubicles turbines and power transformers located inside the cavern.

PROJECT INFORMATION
Client: Enersur
Propietario
Type: Energía
Location: Cerro de Pasco
Date: 1/08/12