Installation of firestop seals in penetrations in fire resistance walls in the building:

Pressurized stairs, pillars, ventilation ducts. Insulation and fireproofing duct air conditioned on the first floor and mezzanine.

PROJECT INFORMATION
Client: Constructora AESA SA
Propietario
Type: Construcción
Location: San Isidro
Date: 1/11/12
APLICATIONS

fasfas

REQUIREMENTS

asdgsadg

ADDRESS

OFFICE Calle Horacio Cachay Díaz 189. Urb. Santa Catalina - La Victoria

PHO. (+51) 1 719-9740 | (+51) 9980-05732

EMAIL ventas@synixtor.com

SÍGUENOS

© Copyright 2016 | Synixtor. All Rights Reserved Developed by Lima Dot