The aim was to isolate each tunnel from each other to prevent the spread of fire between the tunnels. UL certified systems were used to seal all construction joints inside the tunnels and penetrations between them.

PROJECT INFORMATION
Client: Consorcio Túnel Callao
Propietario
Type: Infraestructura
Location: Callao
Date: 1/07/16

ADDRESS

OFFICE Calle Horacio Cachay Díaz 189. Urb. Santa Catalina - La Victoria

PHO. (+51) 1 719-9740 | (+51) 9980-05732

EMAIL ventas@synixtor.com

SÍGUENOS

© Copyright 2016 | Synixtor. All Rights Reserved Developed by Lima Dot